top of page
  • LinkedIn
Malleson Road, Gotherington - 4.png

Our Services

AquaVera Engineering offers a complete suite of services, ranging from feasibility studies and conceptual design to detailed design and technical approval. 

about us page 5.png

Feasibility Stage

During feasibility, we identify site constraints, assess design options, and provide high-level layouts. Giving developers the insight they need to make informed decisions and plan efficiently for the next stage.

Preliminary Design & Planning Stage

At the preliminary stage, we produce coordinated designs that satisfy planning requirements while ensuring a smooth transition into detailed design and adoption. This helps minimise redesign, manage costs, and accelerate approvals.

Detailed Design & Technical Approval Stage

At the detailed design stage, our engineers will produce fully detailed and buildable design packages that achieve timely technical approval with the statutory bodies and allow your development to progress smoothly to the construction phase.

home page left 3.png

Our Full Range of Services

Feasibility Stage

Preliminary Design & Planning Stage

Detailed Design & Technical Approval Stage

Highway Designs

  • Access Design Appraisal

  • Preliminary Road Layout Appraisal

  • Existing Road Network Review

  • Access Junction Design

  • Adoptable Road Network Design

  • Pedestrian/Cycle Connectivity Plans

  • Vehicle Swept Path Analysis

  • Longitudinal Road Sections

  • Road Cross-Sections

  • Road Contour Plans

  • Road Construction Details

  • Kerbing & Surfacing Plans

  • Private Driveway Construction Details

  • White Lining & Signage Details

  • Final Vehicle Tracking Drawings

  • Road Gully Catchment Plans

  • Section 278 Adoption Pack

  • Section 38 Adoption Pack

Drainage Designs

  • Storm and Foul Drainage Constraints

  • Flood Risk Screening

  • Preliminary SuDS Strategy

  • Adoptable Storm Drainage Strategy

  • SuDS Design Plans & Calculations

  • Flood Risk Assessment

  • Adoptable Foul Drainage Strategy​

  • Main Drainage Engineering Layouts

  • Storm and Foul Manhole Schedules

  • Manhole Construction Details

  • Private Drainage Layout Plans

  • Private Drainage Construction Details

  • Impermeable Area Catchment Plans

  • Foul Drainage Catchment Plans

  • Detailed SuDS Feature Designs

  • Flow Control Construction Designs

  • Section 104 Adoption Plans

  • Section 185 Diversion Plans

External Works

  • Site level Constraints

  • High Level Earthworks Strategy

  • Potential Retaining Feature Requirement

  • Preliminary Finished Floor Level Design

  • Part M Access & Levels Design

  • Preliminary Retaining Feature Design

  • Cut & Fill Exercises & Isopachyte Plans

  • Final FFLs & Part M Access Designs

  • Detailed External Levels & Gradients

  • Detailed Retaining Feature Design

  • Final Cut & Fill Exercises

  • External Finishes Plans

  • Combined Services Co-ordination Plans

  • ​Overland Flow & Exceedance Plans

  • Road Setting Out Plans

  • Plot Setting Out Plans

  • Fence Setting Out Plans

  • Driveway Setting Out Plans 

Cricket Pavillion panoramic 2.png

Example Drawings

A selection of example drawings have been provided below, showcasing the standards we aim to achieve on all of our designs.

AVE_000_C_DR_100_*_Engineering Layout Example

AVE_000_C_DR_300_*_Private Drainage Layout Example

AVE_000_C_DR_120_*_Longitudinal Sections Example

AVE_000_C_DR_400_*_External Finishes Plan Example

AVE_000_C_DR_500_*_Road Construction Details Example

AVE_000_C_DR_140_*_Manhole Schedules Example

AVE_000_C_DR_200_*_External Levels and Features Example

© 2025 by AquaVeraEngineering.com. All rights reserved.

SMAS SSIP certification LOGO
bottom of page